Barkerville Gold Intersects 30.16 G/t Gold Over 2.80 Meters and 11.77 G/t Gold Over 5.00 Meters

HIGH-GRADE INTERCEPTS INCLUDE 98.80 G/T GOLD OVER 0.80 METER 105 G/T GOLD OVER 0.50 METER

Barkerville Gold

TSXV: BGM

TORONTO, Jan. 23, 2019 /CNW/ – Barkerville Gold Mines Ltd. (TSXV: BGM) (the “Company” or “Barkerville“) is pleased to announce the final drilling results from the 2018 Cow Mountain exploration and category conversion program at the Company’s flagship Cariboo Gold Project. A total of 63,970 meters were drilled in 231 holes on Cow Mountain during the 2018 drill program and demonstrated continuity of high-grade gold mineralization within vein corridors and extensions down dip and down plunge.

To read entire news release in new tab go to: https://prn.to/2RI2Fgy

Originally Published: January 25, 2019, newswire.ca